Construction Administration

RFI Responses

RFIs pile up. Give your Ai assistant the gist of your answer — a quick voice note, a few typed lines, even just a reference to the right detail — and your Ai assistant drafts a professional, properly formatted response with drawing references, specification citations, and clear direction to the contractor.

  • Give your answer in whatever form is fastest — the Ai formats it to professional standards
  • Automatically references relevant drawing details and spec sections
  • Maintains your firm's response style and language across every RFI
  • Tracks response times so no RFI sits unanswered past its due date
RFI #047 — Response Draft
Detail 7/A5.1 shows a 4" concrete curb at the roof drain. Structural drawings show no reinforcement for curb. Please clarify curb construction and confirm reinforcement requirements.
Turner Construction · Received Jan 22, 2026 · Due Jan 29
"The curb should be 4 inches with number 4 rebar at 12 on center both ways. Refer them to structural detail S3.2 for the typical roof curb reinforcement. Concrete should match the spec section for cast in place."
Draft Response
The 4" concrete curb at the roof drain shall be reinforced with #4 rebar at 12" o.c. each way. Refer to Detail 3/S3.2 for typical roof curb reinforcement requirements. Concrete shall conform to Section 03 30 00 (Cast-in-Place Concrete) of the project specifications. No change to contract documents is required.
Detail 7/A5.1 Detail 3/S3.2 Spec 03 30 00
Ready for review
Approve & Send